In-Line Testing of High Voltage Heaters (HVH)
The production process of HV Heaters involves many steps, with some of them being manual. Various tests are carried out in-line, according to the corresponding manufacturing stages.
Home > Publications > Page 2
The production process of HV Heaters involves many steps, with some of them being manual. Various tests are carried out in-line, according to the corresponding manufacturing stages.
HIL testing allows for prototype designs of equipment like traction inverters to be evaluated in various battery, load and fault situations, without the need to perform the trials with the inverters installed in dynamometers or the vehicles themselves.
Measuring of pH, dissolved oxygen and ORP in different applications while Water Treatment process of Power Plants’ Wastewater.
Measuring of pH, dissolved oxygen and conductivity in boiler feed water, steam and condensate in combined cycle gas turbine in power plants.
Measuring of pH in Pre-Scrubber, in Neutralization and in Lime Scrubber within the Flue Gas Desulfurization Process in Power Plants.
Measurement of pH, ORP and conductivity in cooling water, which must be continuously treated with acid and biocides.
Measuring of pH, ORP and conductivity to check permeate quality and concentrated water as well as checking on module leakage.
Measuring of pH, dissolved oxygen and conductivity in boiler feed water, steam and condensate in combined cycle gas turbine in power plants.
Test systems generate control voltages in a battery model to simulate temperature conditions to the battery management systems for evaluating the temperature management of the BMS.
La vapeur refroidie dans la partie inférieure se dépose sous la forme d’eau de condensation qui présente une grande pureté et donc une conductivité très faible. Sachant qu’une conductivité élevée est le signe d’impuretés, la mesure de la conductivité du condensat est une méthode fiable pour…